David Lloyd is a leading brand in the health and fitness industry with 86 centres servicing approximately 475,000 members across the UK. After being acquired by TDR Capital in 2013, £50m is now being invested into the group in order to expand its network of clubs and grow its membership further.
Several new clubs have already been constructed, with the Glasgow, Newbury and Colchester sites finishing this year. Most notable of these was the latter; having opened in October, it is currently Colchester’s only club with both an indoor and outdoor swimming pool, and also boasts spa facilities, a state-of-the-art gym, exercise studios and indoor and outdoor tennis courts.
The site totals 4,845m², and required approximately 3,500m² of tiling to cover the swimming pools, changing rooms, walkways and reception areas. As with all new David Lloyd Centres, Pellikaan Construction headed up the overall build and appointed Buckingham Pools for the tiling fit out; in turn, Profix Tiling Ltd and The Hurst Group sub-contracted on the project. For the swimming areas, which included three pools as well as spas facilities and changing rooms, Greg Paclawski of Profix Tiling Ltd contacted Adam Willmott, Business Development Manager for ARDEX UK, for advice on the tiling specification. Greg commented, “I was keen to work with ARDEX as I’ve always used their products and never had any problems; they’ve never let me down and their technical support is excellent.”
“The ARDEX specification gave the client confidence in the system, and their fast track products meant we could deliver the project within the tight deadline we were working to.”
Commenting on the project, Adam said,“My role in the fit-out was to liaise with all the contractors involved, from Pellikaan through to Profix, to produce a suitable specification and then ensure the subsequent installation went as planned.”
“The system met the contractors’ rigorous standards, passing independent product and application tests commissioned by Pellikaan. I then visited the site throughout the project to see how the contractors were getting on, and was on hand to advise on any extra works required.”
“Large, varied areas of different types of tiles were fixed throughout the site, using a comprehensive system of ARDEX products. The overall result is a stunning leisure facility that will service its members for years to come.”
Products used for this project
-
ARDEX X 7
Standard Setting Flexible Tile Adhesive
- Ideal for all tile types, including porcelain
- Exceptional grab prevents tiles slipping
-
ARDEX WA
Epoxide Tile Grout & Adhesive
- Clean off up to 85 minutes after application
- For joints 2-12mm wide
-
ARDEX E 100
Additive to Improve Screeding Mortars, and for Bonding/Slurry Grouts
- Improves the mortars elasticity, compressive and tensile strength
- Improves the mortars workability
-
ARDEX A 38
Ultra Rapid Drying Cement for Internal & External Screeds
- Walkable in 3 hours
- Fix ceramic and natural stone tiles after 4 hours
-
ARDEX-FLEX FL
Flexible Rapid Setting Tile Grout
- Tiles can be trafficked after 90 minutes
- Available in 35 colours
-
ARDEX S 7 PLUS
Flexible Waterproof Coating
- Waterproof swimming pools prior to tiling
- Resists water pressures up to 5 Bar
-
ARDEX X 77微纖增強曲折性重磚膠
Flexible Wall & Floor Tile Adhesive
- 德國科技微纖維3D增強配方-抗剪強度加強/黏結強度提升/耐應變
- 大型磚適用
-
ARDEX MICROTEC X 78
Flexible Semi-Pourable Floor Tile Adhesive
- Semi-pourable consistency ideal for solid bed fixing large format floor tiles
- Spend less time mixing & more time fixing with a 3-hour pot life and 60 minute open time
-
ARDEX WPC
Flexible Rapid Drying Waterproof Protection Coating
- Ideal for filling holes & gaps, as well as general application
- Tile after 90 minutes
More projects in 休閒類別
-
格拉斯哥俱樂部翻新工程
-
The Savoy Hotel
The ARDEX range of tile fixing products exceeded expectations
-
倫敦水上奧運中心
A fitting legacy from the 2012 London Olympics
-
Dundee新奧運泳池
Old Olympia Centre replaced with state of the art facility
-
英國聯邦運動會館
It’s a ‘Race to the Finish@
-
Odeon電影院改裝
3 nights to complete and zero downtime
-
Gleneagles高球休閒SPA會館
£5m renovation against the clock
-
ARDEX Helps the Heroes with Recovery Centre Refurb
ARDEX resurfaces state of the art gym complex
-
象與城堡休閒中心
ARDEX help transform the Elephant and Castle area of London
-
Stratford公園休閒泳池中心
1000m² of tiling needing replacing at this 40 year old lesiure centre
-
Duxford 航空博物館
ARDITEX NA reduces the need for intensive preparation and priming, saving time and money
-
Ransome’s Dock Apartments
ARDEX helped turn an industrial warehouse on the Thames to luxury apartments of the highest specification
-
西敏寺聖喬治禮拜堂
18th century architecture meets 21st century art & technology
-
David Lloyd SPA休閒會館翻新
Refurbishing Europe’s premier health & fitness provider
-
金斯頓運動場
ARDEX assist in an extensive refurbishment to the main foyer and reception area